Date: 10 December 2025

On 10 December 2025, the Civil Engineering Technology (Construction) Programme received a visit from two Industrial Advisory Panel (IAP) members as part of the programme review and evaluation session. The invited panel members were Tuan Haji Ir. Abdul Rani bin Ghazali from Perunding Aras Sdn. Bhd. and Mr. Abdul Muhaimin bin Mohd Yunus from Evermix Concrete Sdn. Bhd.

The visit aimed to obtain professional input related to the programme curriculum, programme documentation, and current industry requirements. During the visit, Mr. Abdul Muhaimin, an FKTA alumnus, also conducted a sharing session with students, focusing on preparation before entering the professional working environment. The programme committee would like to express its sincere appreciation for the valuable insights and recommendations for improvement shared by the panel members.